Beban Angin & EPA untuk Tiang Tiang Tinggi: Apa yang Harus Dipersiapkan

Di Mana Panduan Ini Cocok

Daftar Isi

Inputs you should collect

  • Project location and applicable local code reference (if known)
  • Pole height and luminaire quantity per mast
  • Wind zone / wind speed (or “unknown” if not available)
  • Exposure/terrain category (open plain/coastal/urban)
  • Topography notes (hillside, cliff, shoreline)
  • Corrosion environment (C3/C4/C5-M if specified)

Gunakan tombol Lembar Masukan Proyek to collect this fast.

Deliverables you should request

  • Structural calculations (standard/code compliance stated)
  • Drawings: base plate, anchor bolts, pole sections, lowering device (if any)
  • Foundation checklist and required site inputs (soil, constraints)
  • Assumptions stated: wind/exposure, luminaire area, safety factors

Klausul RFQ (salin/tempel)

  • Supplier must provide structural calculation package and drawings for pole + foundation interface.
  • Supplier must state all wind/exposure assumptions and the applicable standard.
  • Supplier must provide foundation deliverables checklist and required site inputs.

Langkah selanjutnya