This guide explains what wind/EPA information matters and what deliverables you should request so structure assumptions are explicit and comparable.
Onde este guia se encaixa
- Execute esse pacote: Pacote de vento e fundação
- Recurso: Carga de vento e centro de fundação
- Lista de espera: CA · Solar
Índice
- Inputs you should collect
- Deliverables you should request
- Cláusulas da solicitação de cotação (copiar/colar)
- Próximas etapas
Inputs you should collect
- Project location and applicable local code reference (if known)
- Pole height and luminaire quantity per mast
- Wind zone / wind speed (or “unknown” if not available)
- Exposure/terrain category (open plain/coastal/urban)
- Topography notes (hillside, cliff, shoreline)
- Corrosion environment (C3/C4/C5-M if specified)
Use o Folha de entrada do projeto to collect this fast.
Deliverables you should request
- Structural calculations (standard/code compliance stated)
- Drawings: base plate, anchor bolts, pole sections, lowering device (if any)
- Foundation checklist and required site inputs (soil, constraints)
- Assumptions stated: wind/exposure, luminaire area, safety factors
Cláusulas da solicitação de cotação (copiar/colar)
- Supplier must provide structural calculation package and drawings for pole + foundation interface.
- Supplier must state all wind/exposure assumptions and the applicable standard.
- Supplier must provide foundation deliverables checklist and required site inputs.