Senarai Semak Asas Tiang Tinggi (Sedia untuk Tender)
Foundations fail when scope and inputs are unclear. This checklist standardizes what to request and what to clarify in tenders.
Di Mana Panduan Ini Sesuai
- Jalankan pakej ini: Bungkusan Angin & Asas
- Sumber: Pusat Beban Angin & Asas
- Senarai pendek: AC · Suria
Foundation checklist (what to request)
- Foundation deliverables checklist (what supplier provides vs civil contractor provides)
- Anchor bolt specification + bolt cage detail
- Base plate dimensions and bolt pattern
- Required site inputs: soil report, constraints, utilities
- As-built and acceptance records
Common traps
- Supplier assumes a wind zone/exposure without stating it.
- Civil scope unclear (who supplies rebar schedule, concrete spec, excavation).
- Anchor bolt pattern mismatch discovered after procurement.
Klausa RFQ (salin/tampal)
- Supplier must provide foundation checklist and required inputs before final design.
- Supplier must provide anchor bolt pattern and base plate drawings early for civil coordination.
- All wind/exposure assumptions must be stated.
