Pola Baut Jangkar & Daftar Periksa Pelat Dasar (Tiang Tinggi)
Anchor bolt mismatch is one of the most expensive procurement mistakes. This checklist makes civil coordination tender-ready.
Di Mana Panduan Ini Cocok
- Bundel: Bundel Angin & Pondasi
- Sumber daya: Beban Angin & Pusat Pondasi
- Terkait: Daftar Periksa Fondasi
Checklist (Before Civil Works Begin)
- Base plate drawing: dimensions and thickness
- Anchor bolt pattern drawing (bolt circle, qty, diameter, spacing)
- Bolt cage detail (if used) + installation tolerances
- Embedment requirement and leveling/positioning method
- As-built requirement: bolt positions verified before pole delivery
Klausul RFQ (Salin/Tempel)
- Supplier must provide base plate + anchor bolt pattern drawings before foundation works begin.
- Acceptance requires as-built confirmation of bolt positions and pattern.
