Senarai Semak Corak Bolt Sauh & Plat Asas (Tiang Tinggi)

Di Mana Panduan Ini Sesuai

Checklist (Before Civil Works Begin)

  • Base plate drawing: dimensions and thickness
  • Anchor bolt pattern drawing (bolt circle, qty, diameter, spacing)
  • Bolt cage detail (if used) + installation tolerances
  • Embedment requirement and leveling/positioning method
  • As-built requirement: bolt positions verified before pole delivery

Klausul RFQ (Salin/Tempel)

  • Supplier must provide base plate + anchor bolt pattern drawings before foundation works begin.
  • Acceptance requires as-built confirmation of bolt positions and pattern.

Langkah Seterusnya