Lighting up government park with solar flood light

Lighting Up Government Park With Solar Flood Light

We have successfully cooperated with old customers to supply solar floodlights to the local government of Malaysia for use in park areas that are difficult to reach by power grids, and have achieved significant results.

Continuing our style of high-quality lighting, we have equipped high-power floodlights on 10-meter light poles and equipped them with cutting-edge high-efficiency LED chips; Long lifespan lithium battery and charge controller. The lighting area of the entire park is as bright as day. After rigorous optical testing, the relevant government departments gave high praise to our lights and promised on site to purchase more of our high-quality lamps.

Now the customer has successfully transferred the project to the government department. This project has successfully raised the customer’s brand awareness in the local area, and the customer is also full of confidence in our products.

Inlux Solar Engineering Team
Inlux Solar Engineering Team

Inlux Solar Engineering Team is the technical content team behind Inlux Solar’s solar street lighting guides, project insights, and product engineering resources. The team works with Inlux Solar’s R&D, technical, production, and quality-control departments to explain solar street light design, component selection, photometric planning, project specification, installation, and long-term reliability for municipal, commercial, EPC, and infrastructure buyers.

Our content is based on Inlux Solar’s factory experience, field project records, product test data, and engineering support for global solar lighting projects, including UNHCR, UNDP, municipal, refugee-camp, highway, industrial, and public-area lighting deployments. Inlux Solar operates a 28,000 m² manufacturing facility with 10 production lines, 30+ engineers, 60+ patents, and 300+ product certificates.

Articles by the Inlux Engineering Team are written or reviewed with input from technical, R&D, production, and QC staff to keep recommendations practical, specification-ready, and aligned with real project conditions.

Artigos: 250