Stadium Glare Control (Tender-Ready)

Dónde encaja esta guía

Define These Before Quoting

  • Glare-sensitive directions (stands, camera positions, nearby roads)
  • Spill boundaries (neighbors, streets, residential zones)
  • Aiming/tilt limits and whether shields/visors are allowed

Entregables que se deben solicitar

  • IES/LDT + simulation report with assumptions and aiming notes
  • Layout plan showing aiming direction and tilt constraints
  • Shield/visor BOM (if used) + photometrics impact stated

Cláusulas de la solicitud de cotización (copiar/pegar)

  • Supplier must address glare/spill constraints in the photometrics report and layout assumptions.
  • Supplier must provide aiming notes and any shielding accessories list (if used).
  • Glare/spill compliance is part of acceptance.

Próximos pasos