High Mast Lighting Project Input Sheet (Tender-Ready)
Use this checklist to request photometrics (IES/LDT + layout), structure readiness inputs (wind/EPA/foundation), and tender-ready deliverables. Fill what you know—leave unknown items blank.
Send Inputs & Request a Proposal →
Tip: run a scenario bundle here: Buyer’s Guide.
Table of Contents
Project Inputs (Copy & Paste)
| Project location | City, country, GPS (optional) |
|---|---|
| Application | Highway / Yard / Port / Industrial / Stadium / Other |
| Area geometry | Road width / area dimensions / mounting positions |
| Pole height | ___ m |
| Pole spacing / layout | ___ m (or “flexible”) |
| Target illuminance | Avg lux ___ ; Uniformity target ___ (if specified) |
| Glare / spill constraints | Yes/No; nearby sensitive areas (houses/roads) ______ |
| Optics preference | Type III / IV / V / Not sure |
| CCT / CRI | CCT ___K ; CRI ___ |
| Power system | AC / Solar / Hybrid |
| Runtime (if solar) | ___ hours/night |
| Worst-month PSH (if solar) | ___ h (or share location) |
| Autonomy nights (if solar) | ___ nights |
| Dimming / controls | Time dimming / Smart control / None |
| Wind data / EPA | Wind speed/zone ___ ; EPA requirement ___ ; Unknown |
| Foundation constraints | Soil info, site limits, underground utilities (if any) |
| Lowering device | Required / Not required |
| Environment | Coastal / Desert / Humid / Cold / Normal |
| Ingress / corrosion | IP__ ; IK__ ; corrosion class C3/C4/C5-M (if specified) |
| Quantity + delivery | Qty ___ ; Incoterms ___ ; Deadline ___ |
Tender-Ready Deliverables to Request
- Datasheet + model mapping
- IES/LDT files + simulation outputs (targets + uniformity)
- Layout / spacing proposal (assumptions stated)
- Wind load / EPA inputs checklist + foundation checklist
- RFQ clauses + BOQ line items + scoring rubric
- Quality evidence pack (tests, traceability, acceptance records)
