Solar Street Light Guides (Engineering Playbooks)

Quick Takeaways (TL;DR)

Start Here (Pick One)

Tender / Procurement Path

Want comparable bids and auditable specs? Use the tender-ready workflow hub.

Open the Buyer’s Guide Hub →

Templates, Evidence & Definitions

Need RFQ/BOQ templates, QC evidence, or IES/DIALux workflow?

Open the Resources Library →

Standards & Test Methods Referenced (Procurement Use)

This page references common lighting + PV + battery safety standards so procurement teams can validate solar street light bids using consistent deliverables. Local codes may apply—use this as a tender checklist.

Road Lighting & Photometrics

  • Road lighting practice reference: ANSI/IES RP-8 (roadway & parking lighting). RP-8 preview
  • Photometric verification: ANSI/IES LM-79 (luminaire photometry & electrical). Reference
  • LED lumen maintenance: IES LM-80 + TM-21 (maintenance method & projection). LM-80 preview
  • Deliverables: IES/LDT + DIALux report (inputs, assumptions, pass/fail criteria).

PV / Battery Safety & Reliability

  • PV module design qualification: IEC 61215. Reference
  • PV module safety baseline: IEC 61730. Reference
  • Lithium battery transport safety: UN Manual 38.3 (shipping test procedures). Regulatory context

Environmental / Protection

  • Ingress protection: IEC 60529 (IP code). Scope
  • Surge immunity reference: IEC 61000-4-5 (lightning/surge immunity method).
  • Impact protection: IEC/EN 62262 (IK code).

Procurement rule: if a supplier cannot name the test method and provide the deliverable (report/file), mark the bid “Incomplete / High Risk” before comparing price.

Browse Guides by Goal

1) Procurement & Tendering

2) Design & Sizing

3) Core Components

4) Controls, Smart & Security

5) Reliability, Installation & O&M

6) Highway Use Case

Start Here (3 common paths)

A) If you are preparing an RFQ/BOQ

  1. Start with RFQ/BOQ Must-Haves to lock configuration and evidence.
  2. Use Apples-to-Apples to force quote comparability.
  3. Open templates in RFQ/BOQ Kit (Resources).

B) If you are sizing for a rainy season / worst month

  1. Confirm layout inputs: Pole Height & Spacing.
  2. Compute backup: Autonomy Days.
  3. Validate worst month: Rainy Season Sizing.

C) If you want reliability & low maintenance

  1. Identify risks: Failure Modes.
  2. Lock protection: IP & IK + thermal: Thermal Management.
  3. Execute correctly: Commissioning + Maintenance.

Next Steps (Keep Your Project Tender-Ready)

Templates & Evidence

Shortlist a System Type

Back to All Guides Hub →

Want a quick engineering sanity check?

Share your road class, pole height, target lux/uniformity, and worst-month PSH assumptions.