Packaging & Shipping

We pack and ship project-grade lighting safely and efficiently—cartons and EPE foam for luminaires, felt and bubble wrap for poles, and ISPM 15-compliant crates for components. Each shipment is labeled, counted with extra items, and backed by SDS/UN38.3 and IMDG/IATA DGR compliance for lithium batteries.

Home / Package & Shipping

Export Packaging Standards

The products are being loaded into the container, and the warehouse staff next to them are recording the inspection form
01 – Standard Export Packaging

Luminaires are protected with EPE foam and strong cartons; poles are wrapped with felt and bubble wrap; battery and electronics are packed in ISPM 15 wooden crates. Lot labels and barcodes ensure traceability during inbound checks.

02 – Extra Quantities & Item Labels

We add extra quantities and clear item labels so your team can verify and install faster upon receipt.

Light pole packaging process1
03 – Regular Spare Parts

We include spare parts to reduce downtime—typically 5–10% for standard components and ~1% for controllers, subject to the order and project needs. (Final list is confirmed on PI.)

Container Loading Plan

01 – Professional Container Loading Plan

We design 20GP/40GP/40HQ loading plans with stable stacking, corner protectors, stretch wrap, and moisture control. This maximizes capacity and minimizes transport risk.

02 – Safe Lithium Battery Transport

We provide SDS (formerly MSDS) and UN38.3 test summaries, and ship under IMDG Code (sea) or IATA DGR (air), with the correct UN classification (e.g., UN3480/UN3481, as applicable). Batteries are shipped in a fully disconnected state to prevent accidental activation.

03 – Multiple Shipping Options

Sea, air, courier, and door-to-door with customs clearance—chosen by lead time, cost, and product type. We tailor the route to meet your project schedule.

04 – From Our Door to Yours

See how we deliver to warehouses and job sites worldwide—airport apron retrofits, 9 m pole airfreight, and containerized road-lighting packages.

Selected Shipping Stories

9 m Poles by Air, MENA

6 sets, 2 pallets, IATA DGR declared; delivery in 6 days.

40HQ to East Africa

Mixed luminaires + poles; container utilization ~92%; arrival 27 days.

Door-to-Door DDP, EU

Integrated solar kits; customs pre-clearance; no missing items on inbound.

Incoterms 2020 – Who Pays for What

TermSeller Cost/Risk EndsBuyer HandlesTypical Use
EXWAt our factoryAll freight, export & import formalitiesBuyer controls logistics
FOBOnboard vessel at originOcean freight, insurance, importSea freight
CFROcean freight paid to destination portInsurance, import & localSea freight
CIFOcean freight + insurance to portImport & localSea freight with insurance
DAPDelivered to named placeImport duties/taxesDoor-to-door
DDPDelivered, duties paid—All-in delivery

Shipping Documents Checklist

DocumentWhat it CoversApplies To
Commercial Invoice (CI)Price, terms, HS refsAll
Packing List (PL)Carton/pallet counts, net/grossAll
Bill of Lading / AWBCarrier transport recordSea / Air
Certificate of Origin (CO)Origin proofAs required
Insurance PolicyCargo coverage (CIF/Buyer)Sea/Air
CE/Test ReportsCompliance evidenceAs required
SDS & UN38.3Battery safety & testsWith Li-ion
IMDG / IATA DGRDangerous goods declarationSea / Air
Fumigation/ISPM 15Wood packaging complianceCrates/Pallets

FAQ

Yes. We provide SDS and UN38.3 documentation and ship under IMDG Code (sea) or IATA DGR (air) with the correct UN classification (e.g., UN3480/UN3481, as applicable). Batteries are shipped in a fully disconnected state.

We commonly ship EXW, FOB, CFR/CIF, DAP, and DDP. We’ll recommend the most suitable term based on your country, shipment size, and deadlines.

Commercial Invoice, Packing List, BL/AWB, Certificate of Origin (if required), insurance (for CIF or when requested), CE/test reports as needed, plus SDS/UN38.3 and IMDG/IATA DGR declarations for lithium batteries.

Luminaires: EPE foam + reinforced cartons; Poles: felt/bubble wrap; Electronics/batteries: ISPM 15-compliant wooden crates with labels and barcodes for traceability.

Yes—typically 5–10% for standard components and ~1% for controllers, subject to the order and project needs (final list confirmed on PI).

Yes. We design 20GP/40GP/40HQ loading plans with stable stacking, corner protectors, stretch wrap, and moisture control to maximize utilization and minimize risk.

Typical ranges: sea freight 20–40 days depending on route; air freight 5–10 days door-to-airport; courier 3–7 days for small consignments. Exact lead time depends on carrier schedules and customs.

Yes, for many destinations. We can provide DDP quotations that include taxes/duties and last-mile delivery where available.

Record photos at unloading, note exceptions on the carrier receipt, keep packaging, and notify us within 48 hours. We will file with the carrier and arrange replacements or parts according to the investigation.

Yes. Send your labeling specifications (carton label, inner label, pallet label, barcode type) before packing; we’ll apply and share proof-of-pack photos.