High Mast Lighting Buyer’s Guide (Tender-Ready)

1) Standardize Inputs

Use the tender-ready input sheet for photometrics + structure + logistics.

Open Input Sheet →

2) Run a Bundle

Pick a scenario and follow a ready-to-execute sequence.

Go to Bundles →

3) Request Tender Files

Send inputs and request IES/LDT + layout + evidence pack.

Request a Proposal →

Table of Contents

Start Here (30-Second Selector)

Choose your scenario and run the matching bundle.

A) Highways / Main Roads

Photometrics + spacing validation (IES/LDT) and wind-load readiness.

Run Highway Bundle →

B) Ports / Yards / Industrial

Glare/spill control + maintenance workflow + acceptance records.

Run Yard/Industrial Bundle →

C) Stadium / Sports

Vertical illuminance, aiming, glare control, and broadcast-ready outputs.

Run Stadium Bundle →

Starter Bundles (Click-and-Execute)

Bundle 1 — Highway / Main Road (Strict Photometrics)

Goal: verify targets and uniformity with IES/LDT before comparing price.

  1. Project Input Sheet (Tender-Ready)
  2. Photometrics Center (IES/LDT + DIALux)
  3. Pole Height, Spacing & Layout Guide
  4. DIALux Inputs & Deliverables
  5. Spec Definitions (Tender Terms)
  6. RFQ/BOQ Kit + Scoring Rubric

Recommended Guides (Live)

Shortlist: AC High Mast · Solar High Mast

Request IES/LDT + Layout Proposal →

Bundle 2 — Ports / Yards / Industrial (Glare, Spill & Reliability)

Goal: control spill/glare, lock acceptance deliverables, and prevent premature failures.

  1. Project Input Sheet
  2. Quality & Evidence Center
  3. Glare & Spill Control
  4. Common Failure Modes
  5. Commissioning & Acceptance Checklist
  6. RFQ/BOQ Kit

Recommended Guides (Live)

Shortlist: AC High Mast · Solar High Mast

Request Evidence Pack →

Bundle 3 — Wind Load & Foundation (Structure-Ready)

Goal: prepare wind/EPA inputs and foundation checklist before finalizing pole height and luminaires.

  1. Project Input Sheet
  2. Wind Load (EPA) & Foundation Center
  3. Wind Load & EPA Explained
  4. Foundation Checklist
  5. Lowering Device Maintenance
  6. RFQ/BOQ Kit

Recommended Guides (Live)

Shortlist: AC High Mast · Solar High Mast

Request Structure Inputs Review →

Bundle 4 — Solar High Mast Sizing (Worst-Month Method)

Goal: avoid under-sizing by stating worst-month PSH + autonomy + dimming assumptions.

  1. Project Input Sheet
  2. Solar High Mast Sizing
  3. Spec Definitions (usable Wh, autonomy, runtime)
  4. Photometrics Center
  5. RFQ/BOQ Kit

Recommended Guides (Live)

Shortlist: Solar High Mast

Request Off-Grid Proposal →

Bundle 5 — Stadium / Sports (Broadcast-Ready)

Goal: cover vertical illuminance, aiming, glare control, and acceptance deliverables.

  1. Project Input Sheet
  2. Photometrics Center (IES/LDT + aiming)
  3. Horizontal vs Vertical Illuminance
  4. Glare & Spill Control
  5. RFQ/BOQ Kit

Recommended Guides (Live)

Shortlist: Stadium Mast

Request Stadium Lighting Proposal →

Bundle 6 — Procurement & Tender (Make Bids Comparable)

Goal: lock normalization rules + pass/fail evidence gates + scoring rubric.

  1. Spec Definitions
  2. RFQ/BOQ Kit
  3. Quality & Evidence
  4. Apples-to-Apples Bid Comparison
  5. Commissioning & Acceptance Checklist

Recommended Guides (Live)

Shortlist: AC High Mast · Solar High Mast · Stadium Mast

Request Tender-Ready Files →

Resource Centers

Product Shortlist (System Types)

Request a Project Starter Pack

Get a tender-ready pack: input sheet + RFQ clauses + BOQ line items + photometrics deliverables checklist.

Request the Starter Pack →

Tip: start with the Project Input Sheet.

FAQ

Do I need IES/LDT files before selecting a high mast light?

Yes—especially for highways, yards, and stadiums. Photometrics is how you verify targets and uniformity defensibly.

What if I don’t know wind data / EPA requirements?

Share location and pole height. We can outline required inputs and assumptions for structure readiness.

Where do I send completed inputs?

Send them via Contact and mention “High Mast Input Sheet”.