Solar Street Light Resources (Engineering Library)

Quick Takeaways (TL;DR)

Start Here: Download the Project Input Sheet (Tender-Ready)

The fastest way to get sizing, IES/LDT files, and a spacing/layout proposalβ€”using standardized tender inputs.

Open the Download Page β†’ Open RFQ & BOQ Kit β†’

Run a Tender-Ready Path (Pick a Bundle)

Choose your scenario. Each bundle is a ready-to-run sequence with templates, evidence gates, and the right system shortlist.

Highway / Main Road

IES/DIALux validation + roadway optics + spacing.

Run Highway Bundle β†’

Urban / Parks (Fast Deployment)

Dimming profile + autonomy + commissioning workflow.

Run Urban Bundle β†’

Coastal / Humid

Corrosion + sealing evidence gates + conservative sizing.

Run Coastal Bundle β†’

Desert / Dust / Heat

Ingress protection + thermal + soiling/maintenance plan.

Run Desert Bundle β†’

Procurement & Tender

Normalize specs + pass/fail evidence + scoring rubric.

Run Procurement Bundle β†’

Installation & Operations

Commissioning records + traceability + O&M workflow.

Run Operations Bundle β†’

Need templates first? Start with RFQ & BOQ Kit and Spec Definitions.

Browse Resource Hubs

Choose the hub that matches your task. Each hub is designed to reduce ambiguity and improve comparability.

Definitions Hub

Standardize key terms: Wavg, usable Wh, autonomy, lumen maintenance, IP/IK, surge, and acceptance evidence.

Explore Spec Definitions β†’

Quality & Testing Hub

QC evidence checklist: IP/IK, battery/BMS, LEDs, driver, surge, corrosion, aging/burn-in, traceability.

Explore Quality & Testing β†’

RFQ/BOQ Kit Page

Templates to lock configuration baselines and prevent silent substitutions in bids.

Open RFQ/BOQ Kit β†’

IES & DIALux Resource Center

Photometrics + simulation workflow: what to request, how to validate spacing, uniformity, and targets.

Open IES & DIALux Center β†’

Buyer’s Guide Hub

Selection logic for contractors/municipalities: sizing, risks, and procurement criteria.

Open Buyer’s Guide Hub β†’

Start Here (Pick Your Goal)

A) If you are preparing a tender / bid package

  1. Open RFQ/BOQ Kit to download or copy baseline templates.
  2. Read RFQ/BOQ Must-Haves to lock evidence and acceptance gates.
  3. Validate layouts with IES & DIALux inputs and simulation requirements.

B) If you are comparing multiple supplier quotes

  1. Standardize terms using Spec Definitions.
  2. Then force comparability via Apples-to-Apples Quote Comparison.
  3. Use Quality & Testing to require proof (reports, records, traceability).

C) If you want sizing confidence (especially rainy season)

  1. Lock layout inputs: Pole Height & Spacing.
  2. Compute backup: Autonomy Days.
  3. Verify worst month: Rainy Season Sizing.

Want a quick engineering sanity check?

Share your road class, pole height, target lux/uniformity, and worst-month PSH assumptions.

Next Steps (Keep Your Project Tender-Ready)

Ensure your solar street light project meets all procurement and engineering standards.

Templates & Evidence

Shortlist a System Type

Tender Pack (ZIP)

Templates + inputs for sizing, IES/LDT delivery, and a spacing/layout proposal.

Download Tender Pack β†’