IES/LDT for High Mast Lighting: What to Request

Where This Guide Fits

Table of Contents

What to request (checklist)

  • IES/LDT files for each proposed luminaire + optic
  • Simulation outputs (DIALux/AGi32): Avg lux, Min lux, uniformity + calculation grid
  • Layout proposal: pole heights, spacing, mounting arrangement, aiming notes
  • Glare/spill mitigation notes (if required)

Assumptions suppliers must state

  • Pole height, spacing, and mounting arrangement
  • Optics type, CCT/CRI, aiming/tilt limits
  • Area boundaries and calculation grid
  • Any depreciation factor used (if any)

Acceptance metrics (what to show)

  • Average illuminance (Avg)
  • Minimum illuminance (Min)
  • Uniformity (define which metric is used)
  • Grid and assumptions in the report

RFQ clauses (copy/paste)

  • Bids must include IES/LDT files + simulation outputs (Avg, Min, uniformity + assumptions).
  • Layouts must include calculation grid and all assumptions.
  • Bids without IES/LDT deliverables are non-compliant.

Next steps