High Mast Quality & Evidence Center (Tender-Ready)
Use pass/fail evidence gates first. This prevents hidden substitutions, premature failures, and warranty disputes.
Table of Contents
- Evidence gates (pass/fail)
- Test & inspection checklist
- Traceability requirements
- Acceptance deliverables
- RFQ clauses (copy/paste)
- Next steps
Evidence gates (pass/fail)
- Photometrics proof: IES/LDT + simulation outputs
- Protection: surge/SPD + sealing/IP evidence
- Durability: corrosion strategy + coating/galvanization records
- Process control: inspection records + traceability + no-silent-substitution policy
Test & inspection checklist
- IP sealing evidence (fixtures, junctions, cable entries)
- IK impact rating evidence (if required)
- Surge protection specification + test evidence (to local requirement)
- Thermal design/derating statement (how output is maintained)
- Corrosion protection: galvanization thickness / coating system (as specified)
- Pole QA: weld inspection, dimensional checks, fastener quality
- Lowering device: commissioning checks + maintenance instructions (if used)
Traceability requirements
- Unique IDs for key components/batches (where applicable)
- Inspection checkpoints (IQC/IPQC/OQC) logged
- No silent substitutions without written approval
Acceptance deliverables
- Final photometrics package (IES/LDT + layout + assumptions)
- As-built drawings set
- Commissioning checklist + acceptance records
- Warranty/SLA document + spares plan
RFQ clauses (copy/paste)
- Provide evidence pack: sealing/IP, surge protection, corrosion protection, inspection records, and traceability.
- Provide acceptance deliverables: layout package + commissioning checklist + as-built drawings.
- No substitutions without written approval; maintain traceability for major assemblies.