Compare High Mast Lighting Quotes (Apples-to-Apples)

Where This Guide Fits

Step 1: Lock Pass/Fail Deliverables (before price)

  • IES/LDT files + simulation outputs (Avg/Min/Uniformity + assumptions)
  • Layout proposal (pole height/spacing/aiming notes)
  • Wind/EPA assumptions + structural deliverables checklist
  • Quality evidence pack (IP/IK, surge, corrosion, inspections, traceability)
  • Acceptance deliverables (as-built + commissioning + warranty/SLA)

Step 2: Normalize assumptions

  • Same target lux/uniformity and same calculation area
  • Same pole height constraints and layout boundary conditions
  • Same glare/spill constraints and aiming limits
  • Structure assumptions stated (wind zone/exposure)

Step 3: Score bids (example rubric)

  1. Compliance (Pass/Fail): photometrics deliverables + assumptions
  2. Structure readiness: wind/EPA + drawings + foundation checklist
  3. Evidence gates: quality + traceability
  4. Lifecycle: O&M + spares + warranty/SLA
  5. Price: only after everything above passes