High Mast Spec Definitions (Tender-Ready)

Normalize tender terms before comparing quotes. This page provides baseline definitions and pass/fail terms.

Open RFQ/BOQ Kit + Rubric →

Standards & Test Methods Referenced (Procurement Use)

This library uses common lighting, electrical, and structural references so procurement teams can validate bids with consistent test methods. Local codes may apply—treat this as a tender checklist, not legal advice.

Lighting & Photometrics

  • Photometric files: IES/LDT + DIALux report (layout inputs, assumptions, pass/fail criteria).
  • Performance verification: ANSI/IES LM-79 (luminaire photometry & electrical). Reference
  • LED lumen maintenance: IES LM-80 + TM-21 (lumen maintenance method & projection). LM-80 preview
  • Sports & stadium (if applicable): IES RP-6 (sports & recreational area lighting). Reference

Electrical Safety & Environmental Protection

  • Luminaire safety baseline: IEC 60598-1 (general requirements & tests). Reference
  • Ingress protection: IEC 60529 (IP code). Scope
  • Impact protection: IEC/EN 62262 (IK code).
  • Surge immunity reference: IEC 61000-4-5 (lightning/surge immunity method).

Pole / Structure (High Mast Specific)

  • Wind load basis (typical): ASCE 7 (minimum design loads for buildings/structures). Reference
  • Highway/municipal structural supports reference (common): AASHTO LTS (supports for signs, luminaires & traffic signals).
  • Lighting columns reference (where required): EN 40 series (design/verification of lighting columns).

How to use: any bid that cannot name the test method and provide the corresponding deliverable (report/file) should be labeled “Incomplete / High Risk” before price comparison.

Claim → Evidence Map (Make Bids Comparable)

Use this table to score quotations. If a claim has no test method + deliverable, it should not be accepted as “comparable”.

Claim in QuotationRequired Evidence (Deliverable)Minimum Acceptance CriteriaRed Flags
“XX lumens / XX efficacy”LM-79 report + datasheet (same configuration as bid)Report identifies model, CCT/CRI, power, test lab, dateOnly brochure numbers; no test method; report mismatch
“IES / DIALux compliant”IES/LDT files + DIALux report (inputs + assumptions)Includes pole height, spacing, target class, uniformityNo files; only screenshots; no input assumptions
IP/IK ratingTest report (IP per IEC 60529; IK per IEC/EN 62262)Report states test setup + rating achieved“IP66” claimed with no enclosure test evidence
Surge protectionSurge test reference + SPD spec + protection topologyStates kV level, waveform reference, protection points“10kV” without method; no SPD part numbers
Solar autonomy / backup days (Solar projects)Energy budget sheet (Wh/day) + dimming profile + PV assumptionsUses worst-month or conservative equivalent assumptionsOnly “X days autonomy” with no runtime profile
PV module quality (Solar projects)IEC 61215 / IEC 61730 certificates + module datasheetCertificates match the offered module familyGeneric certificates; not matching the quoted module
Pole wind load / structure (High Mast projects)Design basis (wind speed, EPA, safety factor) + drawingsStates the load basis + foundation assumptionsNo load basis; only “strong pole” marketing

Table of Contents

Quick baselines (60 seconds)

  • Quotes must include IES/LDT + simulation outputs (Avg, Min, uniformity + assumptions).
  • Quotes must state optics type and any glare/spill constraints.
  • Quotes must state wind/EPA assumptions and provide structural deliverables checklist.
  • Use pass/fail evidence gates before scoring price.

Normalization table (copy/paste)

Photometrics:
- Provide IES/LDT files for proposed luminaire/optic.
- Provide simulation outputs: Avg lux, Min lux, Uniformity (define metric), grid + assumptions.

Optics & color:
- Optics: Type III / IV / V (or specify)
- CCT: ___K, CRI: ___, glare/spill constraints: ___

Electrical & protection:
- Surge protection level: ___ kV (or state "to local requirement")
- IP rating: IP__, IK rating: IK__

Structure:
- Pole height: ___ m
- Wind zone / wind speed: ___
- Exposure category / terrain: ___
- Structural deliverables: calculations + drawings + foundation checklist

Durability:
- Corrosion class: C3/C4/C5-M (if specified)
- Galvanization/coating requirement: ___

Acceptance:
- Required deliverables: IES/LDT + layout + evidence pack + commissioning/acceptance records
  

Photometrics terms

  • IES/LDT: photometric file used to simulate spacing/targets.
  • Uniformity: define metric (Min/Avg or Avg/Min) and report it.
  • Assumptions: pole height, spacing, mounting arrangement, optics, CCT/CRI, aiming notes.

Open Photometrics Center →

Structure terms (wind/EPA/foundation)

  • Wind/EPA assumptions: must be stated and consistent across bids.
  • Structural deliverables: calculations + drawings + foundation checklist.
  • Lowering device: if required, specify commissioning + maintenance deliverables.

Open Wind & Foundation Center →

Quality terms (evidence gates)

  • Evidence gates: sealing/IP, surge, corrosion, traceability, inspection records.
  • Acceptance records: commissioning checklist + serial-to-location mapping (if required).

Open Quality & Evidence Center →