Stadium Lighting: Horizontal vs Vertical Illuminance (Tender-Ready)
For stadiums, “average lux” alone is not enough. This guide explains horizontal vs vertical illuminance, what to request from suppliers, and how to keep bids comparable.
Where This Guide Fits
- Run this bundle: Stadium Bundle
- Related system type: Stadium Mast Light
- Resources: Photometrics Center · RFQ/BOQ Kit
Quick Takeaways
- Horizontal illuminance describes light on the ground; vertical illuminance affects visibility of players/ball and camera capture.
- Stadium tenders should require IES/LDT + aiming notes + vertical results, not only horizontal lux.
- Glare/spill control is often the constraint—require it in the layout assumptions.
What to request (non-negotiable deliverables)
- IES/LDT files for the proposed luminaires and optics
- Simulation report with horizontal and vertical results (targets + uniformity + calculation grids)
- Aiming/tilt notes, glare/spill mitigation (shields/visors if needed)
- Assumptions clearly stated: pole height, mounting positions, optics, CCT/CRI, depreciation factor (if any)
RFQ clauses (copy/paste)
- Supplier must provide IES/LDT files and a simulation report including horizontal and vertical illuminance results.
- Supplier must provide aiming notes and glare/spill mitigation measures (if required).
- Bids without photometrics deliverables are non-compliant.
Common bid traps
- Only reporting “Avg lux” on the ground, no vertical results.
- Hiding assumptions (aiming, tilt limits, shielding) that change glare/spill outcomes.
- Using different optics in simulation vs quoted products.
