Stadium Lighting: Horizontal vs Vertical Illuminance (Tender-Ready)

Where This Guide Fits

Quick Takeaways

  • Horizontal illuminance describes light on the ground; vertical illuminance affects visibility of players/ball and camera capture.
  • Stadium tenders should require IES/LDT + aiming notes + vertical results, not only horizontal lux.
  • Glare/spill control is often the constraint—require it in the layout assumptions.

What to request (non-negotiable deliverables)

  • IES/LDT files for the proposed luminaires and optics
  • Simulation report with horizontal and vertical results (targets + uniformity + calculation grids)
  • Aiming/tilt notes, glare/spill mitigation (shields/visors if needed)
  • Assumptions clearly stated: pole height, mounting positions, optics, CCT/CRI, depreciation factor (if any)

RFQ clauses (copy/paste)

  • Supplier must provide IES/LDT files and a simulation report including horizontal and vertical illuminance results.
  • Supplier must provide aiming notes and glare/spill mitigation measures (if required).
  • Bids without photometrics deliverables are non-compliant.

Common bid traps

  • Only reporting “Avg lux” on the ground, no vertical results.
  • Hiding assumptions (aiming, tilt limits, shielding) that change glare/spill outcomes.
  • Using different optics in simulation vs quoted products.

Next Steps